Publicity of environmental impact assessment on th

2022-10-14
  • Detail

Shanghai Petrochemical linalool project environmental protection rectification plan environmental assessment publicity

Shanghai Petrochemical linalool project environmental protection rectification plan environmental assessment publicity

August 23, 2010

[China paint information] release unit: Shanghai Research Institute of chemical industry

release date: August 20, 2010

1. Description

Shanghai Research Institute of chemical industry (environmental assessment unit) was awarded the first prize of a number of national technological inventions during the "1025" period of Sinopec The first prize of scientific and technological progress and the first prize of natural science were awarded to the technical achievements in the field of new materials. Offshore Petrochemical Co., Ltd. (the construction unit) commissioned to carry out the environmental impact assessment of "the environmental protection rectification plan of linalool project, which is also difficult for Shanghai Petrochemical to change the dilemma of the two industries with a capacity of 2500 tons/year". The first information release is now made to the public in accordance with national and municipal laws and regulations

Sinopec Shanghai Petrochemical Co., Ltd. and Shanghai Research Institute of chemical industry are responsible for the authenticity of the information released at this stage. With the implementation process of the project and the implementation of environmental impact assessment, relevant information will be improved or adjusted

2. Outline of the construction project

(1) project name: environmental protection rectification plan of Shanghai Petrochemical 2500 t/a linalool project

(2) project location: No. 4500, Jinshan Avenue, Jinshan second industrial zone, Shanghai

(3) industry of the project: chemical raw materials and chemical products manufacturing

(4) project content: adjust the pollution treatment measures of the existing 2500t/a linalool plant, and The waste gas treatment system shall be transformed, and the process unit shall be partially transformed to ensure the normal operation of the waste gas treatment system

3. Overview of the construction unit

(1) name of the construction unit: Sinopec Shanghai Petrochemical Co., Ltd.

(2) address of the construction unit: No. 888, Jinshan Road, Jinshan District, Shanghai

(3) contact person of the construction unit: Manager Hu, manager Zhang

(4) contact information of the construction unit: 021 -

4 Summary of the evaluation organization

(1) name of the evaluation organization: Shanghai Research Institute of chemical industry

(2) certificate number of the evaluation organization: EIA Zheng Jia Zi No. 1806

(3) address of the evaluation organization: Building 8, 345 Yunling East Road, Putuo District, Shanghai

(4) contact person of the evaluation organization: Wang Gong, Liu Gong

(5) contact information of the evaluation organization:, 1632

Fax:

e_ Mail:@

5. Working procedures and main work contents of environmental impact assessment

main procedures of environmental impact assessment of the project: Based on the verification of engineering data, according to the actual emission source and source intensity of linalool device, focus on the analysis of the problems existing in the current environmental protection measures and the necessity of modification; Combined with the environmental status and environmental protection objectives of the construction area, the degree and scope of environmental impact of linalool device after the rectification of the environmental protection plan are analyzed. The feasibility of the environmental protection rectification plan of the project is analyzed. Its spectrum is 10 minutes wide. Combined with the national environmental protection policies and regulations, public opinions and environmental impact analysis results, the requirements and suggestions of environmental protection measures are further put forward

the key work of environmental impact assessment includes: the verification of the actual emission source intensity of the project, the analysis of current problems, the analysis of cleaner production, the prediction and evaluation of environmental impact after the rectification of the environmental protection plan, the feasibility analysis of the reconstruction plan of pollution control countermeasures, public participation, environmental management and monitoring, total amount control, etc

6. Main matters of soliciting public opinions

(1) contents of soliciting public opinions

1) public views on the environmental quality of the area where the project construction site is located, and what main environmental problems they think exist

2) comments on the public's understanding of the project and the necessity of construction

manufacturing a variety of nano plastic filling materials 3) environmental protection issues that the public is mainly concerned about in the process of project construction and operation

4) public attitude towards the construction of the project

5) public opinions or suggestions on environmental protection measures and environmental management in the construction of the project

(2) place and method of publicity

this publicity is the first information disclosure of environmental impact assessment, and it is publicized at Shanghai environmental station. At the later stage of the EIA work, the second information disclosure will be carried out and public opinions will be further consulted

7. Main ways for the public to put forward their opinions

the public can express their opinions on the project construction and environmental assessment work by sending e-mail, fax, letter, etc. to the construction unit and the assessment institution (issues unrelated to environmental protection are not accepted)

please leave your name and basic information (unit or address, education level, occupation, contact information, etc.) when expressing your opinions, so that you can make a return visit when necessary

8. The valid period of information release is

10 days from the release of this information

Copyright © 2011 JIN SHI