Henkel Chemical Technology (Shanghai) expansion project environmental assessment publicity
issued by: Shanghai Environmental Energy Conservation Engineering Co., Ltd.
release date: May 24, 2010
related link: brief version of the environmental assessment report environmental assessment first publicity
1. Description
Shanghai Environmental Energy Conservation Engineering Co., Ltd. is entrusted by Henkel Chemical Technology (Shanghai) Co., Ltd, Carry out the environmental impact assessment of the output expansion project of Henkel Chemical Technology (Shanghai) Co., Ltd. The second information release is now made to the public in accordance with national and municipal laws and regulations
Henkel Chemical Technology (Shanghai) Co., Ltd. and Shanghai Environmental Energy Conservation Engineering Co., Ltd. are responsible for the authenticity of the information released at this stage. With the implementation process of the project and the implementation of environmental impact assessment, relevant information will be improved or adjusted
2、 Overview of the construction project
(1) project name: output expansion project of Henkel Chemical Technology (Shanghai) Co., Ltd.
(2) project location: it can instantly measure and record the characteristic curve of data in the process of impact
(3) industry of the project: c2600 chemical raw materials and chemical products manufacturing industry
(4) project content: Henkel Chemical Technology (Shanghai) The output expansion project of the company is based on the existing production projects of adhesives, lubricants, release agents and graphite coatings. Since the original project was put into operation in 2002, the output of the original project has increased year by year. The annual output has increased from 20000 tons per year to 40000 tons per year, and the production equipment has also increased, but the production process has not changed
(5) conclusion of environmental impact assessment of the project
waste gas: the waste gas of the project includes feeding dust and boiler combustion waste gas. Among them, the feeding dust is discharged by setting exhaust at the feeding port. When I was at CPA (Building Products Association), I learned about brufma (British rigid polyurethane Manufacturers Association) pipe, which is connected to the water curtain dust removal device. After treatment, it is discharged up to the standard. The boiler uses natural gas as fuel, and the combustion waste gas is discharged at high altitude up to the standard
wastewater: the wastewater of this project includes production wastewater and domestic sewage. After being treated by the sewage treatment station, the production wastewater and domestic sewage are included in the municipal sewage pipe and finally discharged into the eastern Songjiang sewage treatment plant for treatment
solid wastes: the solid wastes of this project include hazardous wastes (sewage treatment sludge) and domestic garbage. Hazardous wastes shall be disposed by entrusting qualified units without direct discharge. Domestic garbage is cleared and transported by the environmental sanitation department
noise: the noise of this project is mainly production noise and the operation noise of new water chillers, of which the production noise source is located in the workshop and the water chiller is located in an independent machine room. After sound insulation and distance attenuation through the wall, the predicted value of day and night noise at a distance of one meter outside the East, South, West and north boundary of the plant meets the class 3 standard of the emission standard for environmental noise at the boundary of industrial enterprises (GB), that is, ≤ 65dB (a) in the daytime and ≤ 55dB (a) at night
3. The environmental impact assessment document of the construction project
(1) the abridged version of the report
is available to the public at Shanghai environment station.
(2) review period
within 10 working days from the issuance of this announcement
4. Contact person and contact information of the evaluation organization
(1) name of the evaluation organization: Shanghai Environmental Energy Conservation Engineering Co., Ltd.
(2) there is a stopover phenomenon after unloading. Address of the evaluation organization: room 306, No. 236, Guohuo Road, Huangpu District, Shanghai (zip code: 200011)
(3) contact person of the evaluation organization: Miss Zhang
(4) contact information of the evaluation organization:
:,
e-mail:sety@
5 The scope of soliciting public opinions
the opinions and suggestions of residents, enterprises and other affected people in the area on the environmental protection of the construction project (issues unrelated to environmental protection are not accepted)
6. Public feedback
(1) feedback method
the public's understanding and opinions on the contents involved in the abridged version of the environmental impact report published this time can be fed back to the construction unit and the environmental assessment unit through published e-mail, fax, letter and other means
(2) the feedback time limit
is still blank in Chinawithin 10 working days from the issuance of this announcement
7. Effective period of information release
within 10 working days from the issuance of this announcement