Publicity of environmental impact assessment of th

2022-10-23
  • Detail

Publicity of environmental impact assessment for the construction project of Ye's Zhangjiang R & D center

publicity of environmental impact assessment for the construction project of Ye's Zhangjiang R & D center

February 25th, 2011

[China paint information] released by: Shanghai Academy of Environmental Sciences

release date: February 23rd, 2011

1 Description

Shanghai Academy of Environmental Sciences was entrusted by Ye's chemical research and development (Shanghai) Co., Ltd. to carry out the environmental impact assessment of the construction project of Ye's chemical Zhangjiang R & D center. The first information release is now made to the public in accordance with national and municipal laws and regulations

Ye's chemical research and development (Shanghai) Co., Ltd. and Shanghai Academy of environmental sciences are responsible for the authenticity of the information released at this stage. With the implementation process of the project and the implementation of environmental impact assessment, relevant information will be improved or adjusted

2. Outline of construction project

(1) project name: Ye's chemical Zhangjiang R & D center construction project

(2) project location: Building 1, No. 3728 Jinke Road, Zhangjiang High Tech Park

(3) industry of the project: Engineering and technical research and test development (m7520)

(4) project content: mainly including coating research laboratory, printing material research laboratory, ink research laboratory, analysis laboratory, etc

3. Overview of the construction unit

(1) Name: Ye's chemical research and development (Shanghai) Co., Ltd.

(2) address: room 2009, No. 450 Caoyang Road, zip code: 200062

(3) contact person: Miss Yang

(4) contact information: e-mail:yangsy@

4 Summary of the evaluation organization

(1) Name: Shanghai Academy of Environmental Sciences

(2) Certificate Number: National Environmental Assessment Certificate Jia Zi No. 1801

(3) address: No. 508 Qinzhou Road Post Code: 200233

(4) contact person: Mr. Yu

(5) contact information: e-mail:sep_ Besides EIA @

BMU and CMU, Chinese enterprises often realize the renewal of generation 1 products by introducing foreign technology. There is a large piece of plane 5. Working procedures and main work contents of environmental impact assessment

prepare environmental impact reports according to the requirements of relevant technical guidelines for environmental impact assessment. The emphasis of environmental impact assessment is determined according to the content and characteristics of the construction project

(1) working procedures

① the environmental assessment unit accepts the entrustment of the environmental assessment task

② project data collection and environmental quality status investigation

③ preparation of the environmental impact report when selecting to test the fatigue life of the spring

④ public opinion investigation

⑤ the construction unit applies for the environmental impact report and other relevant materials to the competent environmental protection department

(2) Main work contents

① project site survey and environmental sensitive point investigation, but the ingot produced in this way has a long cooling time

② environmental quality status evaluation

③ project engineering analysis

④ environmental impact prediction and evaluation

⑤ environmental protection measures analysis

6. Main matters for public opinions

public opinions and suggestions on Environmental protection of the project construction, The main contents include: whether the site selection of the project is feasible; Suggestions on environmental protection during construction and operation of the project

7. Main ways for the public to put forward opinions

the public can express their opinions on the project construction and environmental assessment work by sending e-mail, fax, letter, etc. to the construction unit and the assessment institution (issues unrelated to environmental protection are not accepted). Please refer to Article 3 and 4 for contact information. Please leave your real name and basic information (unit or address, education level, occupation, contact information, etc.) as far as possible for public comments, so as to feedback as needed and make a return visit if necessary

8. Effective period of information release

the effective period of this information release and public consultation is within 10 working days from the date of this release